Turn Cold Asphalt Production Into Your Profitable Business
Construction consultants
Complete manufacturing plant for all-weather asphalt. 15 tons/hour capacity. Start producing in your region.
We manufacture complete industrial plants that produce cold asphalt mixture. This is not a product sale – we provide you with the manufacturing equipment and technology to establish your own production facility. Your plant will produce innovative road repair material that works in any weather conditions, creating a profitable business opportunity in the growing African infrastructure market. Below you’ll find exactly what you’re investing in and what your business will produce.
What We Manufacture: Production Equipment, Not the Asphalt Itself

What You Buy
Complete cold asphalt manufacturing plant with capacity of 15 tons per hour. Full industrial equipment line including drying drums, mixers, storage tanks, control systems, and packaging installations. Turnkey solution with installation support and operator training.

What You Produce
Your plant will manufacture cold asphalt mixture – an innovative road repair material that works in temperatures from -30°C to +60°C. You will supply this material to construction companies, municipalities, and road maintenance services throughout your region.
Why Cold Asphalt Production is a Strategic Opportunity in Africa
1. Growing Infrastructure Demand
2. Climate Advantages
3. Year-Round Operation
4. Local Production Benefits

All-weather asphalt mixture is used for
Shelf life in bags up to 10 years!
The delivery line equipment for the preparation of cold asphalt (15 t/h)
| List of equipment | Quantity |
| Cleaning system: | |
| The cyclone dust collector | 1,000 |
| Bag filter for dust-free air cleaning | 1,000 |
| Screw for feeding dust from the cyclone to the metering unit | 1,000 |
| The storage of inert materials: | |
| Two bunkers on 5 m³ | 1,000 |
| Conveyor weight for dosing cube-shaped crushed stone and screenings | 1,000 |
| Conveyor for feeding inert materials into the drying drum | 1,000 |
| Block heating and mixing: | |
| The drum dryer with burner (heating, drying of broken stone and screenings) | 1,000 |
| The twin-shaft mixer (preparation of asphalt mixture) | 1,000 |
| Additive metering unit with pump | 1,000 |
| Dust doser | 1,000 |
| Conveyor for feeding the ready mix to the filling plant | 1,000 |
| Fuel tank (V-5m3) | 1,000 |
| Block storage and dispensing of bitumen: | |
| Tank for bitumen (35 tons) | 1,000 |
| Tank with pump for receiving bitumen from bitumen truck | 1,000 |
| Station heat carrier oil for liquid fuel | 1,000 |
| Piping with heat included | 1,000 |
| Control system: | |
| Remote control (table) control module | 1,000 |
| Control Cabinet power | 1,000 |
| Operator’s cabin | 1,000 |
| Additive preparation unit: | |
| Reactor with a capacity of 3 tons of product complete with stirrer | 1,000 |
| Weighing frame with a weighing limit of 4000 kg | 1,000 |
| Pump for bitumen supply to the reactor for additive preparation | 1,000 |
| Pump for diesel fuel supply to the reactor for additive preparation | 1,000 |
| Dispenser with pump for feeding concentrate into the reactor for additive preparation | 1,000 |
| Installation for packing the finished product: | 1,000 |
| Installation for packing cold asphalt in bags of 25 – 30 kg | 2,000 |
| Installation for packing cold asphalt bag big Bag 1000 kg | 1,000 |
Power consumption 140 kW
Schematic view of the plant



- sand and gravel dispenser
- conveyor
- drying drum
- asphalt mixer
- additive doser
- conveyor
- air filter of “Cyclone” type
- air filter fan
- bag filter for dust-free air cleaning
- unit for packing asphalt into bags
- bitumen storage tank
- oil heating station
- tank with pump for bitumen reception from bitumen truck
- reactor for the preparation of additives
- operator`s room
- sump for water
Average payback time of the project – 6 – 8 months
Possible delivery of a plant with a capacity of 10 t/h
FAQ
Total investment includes equipment cost, shipping, installation, and initial raw materials inventory. We provide detailed breakdown during quotation. Financing options may be available depending on your location.
Typical installation and commissioning takes 2-4 weeks depending on site readiness and local conditions. Our team works with your schedule to minimize downtime.
Main inputs are crushed stone, sand, bitumen, and specialized additives. Most materials are available locally in African markets. We provide sourcing guidance and specifications for your region.
Training is conducted in English or French with technical translators if needed. We also provide operation manuals and video guides in both languages.
We maintain spare parts inventory and provide remote technical support. For major issues, our technicians can visit your site. Preventive maintenance schedule minimizes unexpected breakdowns.
Yes, the system is modular. You can add additional mixing capacity, storage tanks, or packaging lines as your business grows. We support scalability from the initial design phase.
